Murray Grove is made of identical prefabricated, monocoque light steel framed boxes that were factory assembled, trucked to the site and lifted by crane into position. These building units are stacked, and connected at the corners rather like marine container vessels. Each module has finished interiors, is wired and plumbed, and comes complete with carpets and kitchen and bath fixtures, doors and windows. The site work was done with conventional piles and foundations and the modules were assembled on these platforms and the construction time was only 7 months.